Nigel Copson of Lafarge Tarmac digs new drainage channels in the car park. |
Mountsorrel Halt car park starts to take shape. A Geogrid mesh system will be added to give a hard wearing surface that still allows grass to grow through. |
Nigel has reprofiled the cutting side, dug out the car park area and covered with a sub base. He has also dug out the base of the cutting where the platform will go and added additional drainage to the cutting side.
In addition to this Soar Valley Landscapes have cut out the access path route on the cutting side.
Our volunteers have also assisted rebuilding dry stone walls and surveying and setting out for the work.
No comments:
Post a Comment